– Foundation Works
-
Pile cap, abutment dan Pier, slope protection High Speed Rail Jakarta-Bandung, Purwakarta (2019)
-
Piling of minipile (pilenett) & Piling of Steel sheet pile/SSP – Foundation of Railroad/KA, Kutoarjo (2018).
-
Pile Cut, Piling of Steel Sheet pile – Hospital Building RSUD Wates, Kulonprogo – Yogyakarta (2018).
– Structure Works
-
Steel frame of sunshading, steel door, railing, canopy frame, Connecting bridge – Bank of Indonesia Building, Makassar (2016).
-
Steel frame façade, elevator separator beam – Farmation Faculty Building Airlangga University, Surabaya (2017).
-
Steel Stair– Renovation of Jatidiri Stadium, Semarang (2017).
-
Temporary steel bridge & deck pier – Train Bridge Purwokerto-Notog, Purwokerto (2017).
-
Steel Struktur Reinforced Beam Works, Steel Frame of Canopy, Steel Roff frame, Steel Fence Work – Hospital Building RSUD Wates, Kulonprogo – Yogyakarta (2018).
-
Chiller Foundation Works, Client: PT. Indo Kordsa, Citeureup, Bogor, Jawa Barat, (2023).
– Architecture, Finishing, Interior Works, Villa Works
-
Parquet wood floor, wallpaper, lemari tanam, backdrop, Aluminium Façade/karawangan – Bank of Indonesia Building, Makassar (2016).
-
Site Office, Ceiling Works – Hospital Building RSUD Wates, Kulonprogo – Yogyakarta (2018).
-
Construction Management of School Building SDIT Yaa Bunayya, Sleman –Yogyakarta (2018-2019).
-
Muding House, at krobokan, Kuta Utara, Badung. Client: Bpk. Ir. Wayan Suarja Agung R. Scope of Works: Finishing works of Hotel & Pool, Badung, Bali (2023).
-
Structural and finishing work for PARQ DD villa complex in Ubud, Bali (2023)
-
Finishing work for PARQ Family villa complex in Gianyar, Bali (2023)
-
Retaining wall work for Puri Sidem, villa complex in Keliki, Ubud, Bali (2023)
-
Finishing work for Maya Hotel, Canggu, Bali (2023)
– DESIGN & ENGINEERING WORK
-
Project Structure Audit – Amalfi Villa, Badung, Bali (2023)
-
Project Structure Audit – Solair Villa, Badung, Bali (2024)
-
Detail Engineering Design (DED) for Structure & MEP – Sea Sea Hotel, Badung, Bali (2024)2
– MEP Work
-
Instalation of Solar Panel, at Ubud, Gianyar, Bali. Client: PT. Amperra Alternative Solutions. Scope of Works: Precast fabrication 2000nos+, installation of solar panel 1000+ unit, Ubud, Bali (2023)
-
MEP instalation for Sky Stars villas, Uluwatu, Bali (2023)


